EnergyNews wire, 2 h ago

France raises renewable tender to 1.5 GW and moves to one baseload reference price

Reported by pv magazine

Image: pv magazine

France will raise the size of its next technology-neutral renewable energy tender from 500 MW to 1.5 GW, according to a government announcement made on 25 November. The draft tender rules, submitted to the Energy Regulatory Commission (CRE), had set the smaller volume. The tender is expected to open within days.

The change follows concerns from industry groups, which asked for the scheme to accept every renewable technology. Under the revised design, all technologies will compete in the same auction rather than in separate tracks.

The second major change concerns how payments are calculated. Until now each technology had its own reference price tied to its generation profile. Solar, for example, was measured against prices during the midday hours when panels produce most of their power. A single baseload reference price, called M0 baseload, will replace these profile-based figures for all technologies. It will use the mean spot price for each month, taken over all 24 hours and across the country.

Producers will therefore face wholesale price swings more directly, and the shape of their output will matter less for their reference price. The available reports do not give a firm start date, bid deadlines, project sizes or support volumes per technology. Those details remain unknown.

Enjoying this? Get the Energy brief

Every Friday: prices, subsidies and what changed in your market.

✓ Free · seven editions · one click to leave

Topics
Story continues on pv magazineAdd us as a preferred source on GoogleSee our stories first in Google’s Top Stories.
Get alerts on big newsOnly the big news, at most once a day. No email, no account.

Original reporting by the sources above. Summary by smart-home.space.